Figure from Boverket 2009.
 
  • 33,4% of construction work time is pure waste.
  • If the waste is reduced to 20% of working time, the wage cost is reduced by 13,4%.
  • The Construction Entrepreneur total cost is reduced by 4,5-5,9%.
  • The Construction Entrepreneurs´ profit for a project with total production budget of 100 million SEK is estimated to increaseby 4,5-5,9 million.

 